Erecting the Rig Substructure on Ma’anit-Rehoboth #2 Well Site

Erecting rig substructure and raising the mast at the Ma’anit-Rehoboth #2 under the direction of the Zion Oil drilling team. Once erected the rig stands several stories tall and is in operation around the clock.