Erecting rig substructure and raising the mast at the Ma’anit-Rehoboth #2 under the direction of the Zion Oil drilling team. Once erected the rig stands several stories tall and is in operation around the clock.
Erecting rig substructure and raising the mast at the Ma’anit-Rehoboth #2 under the direction of the Zion Oil drilling team. Once erected the rig stands several stories tall and is in operation around the clock.